10 buccaneer gt, falcon gte, Assembly – IDEAL INDUSTRIES BUC5034 User Manual

Page 10

Advertising
background image

10

Buccaneer GT, Falcon GTE

- Installation, Assembly & Servicing

ASSEMBLY

2

Assembling the boiler onto the tank
-

Place the boiler on the tank so that it is
positioned on the first two marks on the
front of the tank.

-

Assemble the boiler as instructed in
views 3 - 13 of Buccaneer GT boiler
Assembly Instructions.

14

15

Assembling the tank front panel
-

Fit the tank front panel after inserting the thermometer bulb
in the thimble tube of the inspection plug of the tank.

3

/

4

" tubes

BUC5014

*

BUC5015

* Automatic bleeder

valve not supplied

Installing the pipes
-

Connect the pipes between boiler and tank (package
BH 46) - see the instructions on page13.

*7+#$

Advertising