Buccaneer gt, falcon gte, 11 assembly, 2 falcon gte combination boiler – IDEAL INDUSTRIES BUC5034 User Manual

Page 11

Advertising
background image

Buccaneer GT, Falcon GTE

- Installation, Assembly & Servicing

11

ASSEMBLY

Boiler

GTE 4 150

GTE 5 150

GTE 4 250

GTE 5 250

Boiler Body
delivered loose
- front section
- intermediate section
- rear section
- set of assembly rods
- accessory package

Mounted boiler
body with
accessories

Control Panel -
Standard

Casing

Domestic Hot

150

Water Tank

250

Front Panel of tank

3.2 FALCON GTE COMBINATION BOILER

Tools required:

- Phillips head screwdriver
- Wide flat screwdriver
- 13mm spanner

Packaging: the tables below show the numbers of the packages
which make up the boiler. The packages are listed in the order in
which they are opened for assembly.

1

1

1

1

2

3

2

3

1

1

1

1

-

-

-

-

IL 4

IL 5

IL 4

IL 5

IL 24

IL 25

IL 24

IL 25

IC 7

IC 7

IC 7

IC 7

IL 14

IL 15

IL 14

IL 15

BH 59

BH 59

-

-

-

-

BH 9

BH 9

-

-

BH 47

BH 47

Hydraulic Connection
Kit

BH 46

BH 46

BH 46

BH 46

Hydraulic Connection
Kit

BH 46

BH 46

BH 46

BH 46

Domestic Hot
Water Sensor

AD 127

AD 127

AD 127

AD 127

The assembly of any optional devices purchased with the boiler is described in the instructions supplied with relevant device or in the
control panel instructions.
The list of available optional devices is provided in the applicable price list.
1.

Refer to the assembly instructions supplied with the burner.

*7+#%

*7+#!#

*7+#!$

BUC5039

BUC5040

Advertising