Аб в г – IDEAL INDUSTRIES BUC5034 User Manual

Page 9

Advertising
background image

Buccaneer GT, Falcon GTE

- Installation, Assembly & Servicing

9

*7+#!

ASSEMBLY

Assembling the base and draining tube
1.

Lay a sheet of paper in front of the boiler body, take the
boiler body off the pallet and place it standing on the furnace
door.

2.

Remove the adjustable feet assembled on the base and
replace them with the four protective plastic plugs supplied
in connection kit package BH 46.

3.

Unscrew

1

/

2

" plastic plug A from the rear section of the boiler

body.
Fit the base onto the feet of the boiler and clip it onto the
rear section.

4.

Screw the draining pipe onto the rear section. Make the
connection watertight with hemp or filler.

5.

Set the boiler body on its feet.

1 Package IC1, IC2, IC3

BUC5010

A

*7+#

1

2

1

2

1

2

1

2

*7+#

А

Б

В

Г

Advertising