12 buccaneer gt, falcon gte, Assembly – IDEAL INDUSTRIES BUC5034 User Manual

Page 12

Advertising
background image

12

Buccaneer GT, Falcon GTE

- Installation, Assembly & Servicing

ASSEMBLY

37

39

38

Assemble the boiler as instructed in figures 1 - 16

Assembling the boiler on the hot water tank
-

Place the boiler on the tank if required with a handling
tool (if required).

-

Assembly the boiler as instructed in figures 17 - 33 of
boiler assembly instructions for Falcon GTE.

Installing the tubes
-

Connect the tubes between boiler and tank (package BH
46) as directed in the instructions on page 13.

Assembling the tank front panel
-

Insert the thermometer bulb in the thimble tube of the
inspection plug of the tank (For 250 litre system - separate
package BH 47) and fit the tank front panel.

*

BUC5017

*Automatic Bleeder

valve (not supplied)

*7+#&

BUC5041

Advertising