Table 1-7. SP Switch error conditions (continued)

Error #

Message/condition

Description and action

−8

(SPS)

Device status: Device has been
removed from network because of a
miswire

Link status: Link has been removed
from network, probable miswire

Description: Initialization of this link detected a different switch
node number than the one expected.

Action:
1. Check this connection against the actual hardware cabling.
2. If the cabling does not match, correct the cabling

problem, then go to step 5.

3. Check the node’s hostname (or IP address) and switch

node number against the configuration using the command:

splstdata -s | pg

(standard node)

SDRGetObjects DependentAdapter

(dependent node)

4. If this occurs on all nodes of a frame, check for a

logical-to-physical frame number mismatch.

5. Have the customer update the configuration, or you can

correct the cabling, as appropriate.

6. Repeat “Step 0620-001” on page 1-17 for next problem or

go to “Step 0620-043” on page 1-36 to verify fix.

−9

(SPS)

Device status: Destination not
reachable

Link status: Link has been removed
from network, not connected

Description: Possible hardware problem.

Action: Go to “Step 0620-004”.

Step 0620-004

You were directed here by an Error Condition listed in Table 1-7 on page 1-19 which lists functional
problems reported in /var/adm/SPlogs/css/out.top file. This file lists all switch data connections with
comment lines indicating the various types.

1. Check the entire /var/adm/SPlogs/css/out.top file for errors before proceeding to the prioritized table.

2. Use the following prioritized table to service problems reported in the /var/adm/SPlogs/css/out.top

file. The messages are from comment lines preceding the error.

Notes:
a. Be aware that wrap plugs or terminators used in the following steps can potentially fail; therefore,

be sure that a diagnostic wrap plug or terminator is not faulty before performing major
replacements.

b. Where applicable, frame and SP Switch jack numbers are indicated on each line of the out.top file.

(Refer to “Format structure” on page 2-1 for more information on the nomenclature.)

For example:

L01-S00-BH-J18

identifies Logical frame 1, S00-BH-J18

E02-S00-BH-J18

identifies Physical frame 2, S00-BH-J18

L03-N01

identifies Logical frame 3, Node 1

E02-N04

identifies Physical frame 2, Node 4

S01-S02-BH-J3

identifies Multi-switch frame 1, slot 2, BH-J3

SP Switch function (MAP 0620)

Chapter 1. Maintenance Analysis Procedures (MAPs)

1-21