IBM RS/6000 SP User Manual

Page 66

Advertising
background image

Note: When attaching exterior and interior cables to a POWER3 SMP High Node allow for enough cable

for a 2-foot service loop for node movement into service position.

Note: For a multi-switch frame (F/C 2030/1), refer to Figure 2-7.

Figure 2-7. Frame cabling routing path in rear of RS/6000 SP frame — 1.93 m frame

Figure 2-8. Frame cabling routing path in rear of RS/6000 SP frame — 2.01 m frame

2-10

RS/6000 SP: SP Switch Service Guide

Advertising