JVC 250 User Manual

Page 175

Advertising
background image

Chapter 8---Software and Protocol

8-8

Model 250 Service Manual

| Import Configuration |

| Start SEND TEXT Upload from |

| Host on Serial PORT A |

| -To Abort: |

| ->Stop Host Upload, |

| ->THEN Press ESC to Abort |

=================================

6.

Windows TERMINAL: Transfers + Send Text File....

6.1 Directories - set directory to desired upload directory (C:\TEMP)

6.2 File Name: - Type desired File Name (for example: import1.txt)

6.3 Select OK with mouse or press Enter key (upload begins)

6.4 Verify TERMINAL screen shows status line at bottom:
Stop, Pause, “% complete bar”, Sending: EXPORT1.TXT

6.5 Data transfer will continue until complete or an error occurs or the

User Aborts: Expect 10 minutes to import 20 sources (500,000 bytes)
at 9600 baud.

6.6 At successful end, TERMINAL will remove the bottom line.

7.

Model 250 Menu:

When the projector detects the successful end of the transfer the following
screen is displayed:

=================================

| Import Configuration |

| IMPORT COMPLETE |

| New Configuration is active |

| |

| - Press ESC to Continue |

=================================

Press ESC to exit the projector Import operation and return to the
Maintenance Menu. There is a 10 second

pause before the screen is

redrawn.

8.

USER ABORT:

Windows TERMINAL: FIRST press STOP to end the Host Upload
transfer.

Model 250 Menu: THEN press ESC to abort the projector Import
operation.

=================================

| Import Failed |

| IMPORT ABORTED BY USER |

| Old Data was Restored. |

| - STOP Host SEND DATA, |

| THEN Press ESC |

=================================

Advertising