Sundance Spas 680 User Manual
Page 20

Page 14
680 SERIES
5. The electrical supply for this product must include a suitably rated
switch or circuit breaker to open all ungrounded supply conductors
to comply with Section 422-20 of the National Electrical Code/USA,
ANSI/NFPA 70. The disconnecting means must be readily accessible
to the spa’s occupant but installed at least 5 feet (1.5m) from spa
water.
6. The electrical circuit supplied for the spa must include a suitable
ground fault circuit interrupter (GFCI) as required by NEC Article
680-42.
7. To gain access to the spa’s power terminal block, remove the screws
securing the cabinet panel on the side of the spa under the control
panel. Then remove the four control box door screws and door
(Figure A-B, pages 14-15).
8. Select the power supply inlet you want to use (Figure A, page 14).
Feed power cable to control box, then install it through the large
opening provided in the bottom side of the box.
9. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figures C-F, page 15). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
10. Install control box door and screws and reinstall the cabinet side
panels.
Figure A
Equipment Area
7
8
3
6
2
5
5
1
4
9
1.
Control Box
2.
Power Supply Inlet(s)
3.
2-Speed Pump #1
4.
Heater
5.
Pump Drain Plugs
6.
1-Speed Pump #2
7.
Optional CD Ozonator (Purchased
separately on North American models;
standard equipment on export models
8.
Ozone Injector
9.
Control Panel
Note: Pump locations vary by model