Assembly – Stanley Black & Decker Stanley Chipper/Shredder With 2-Way Feed CH2 User Manual
Page 12
 
9
STANLEY is a registered trademark of The Stanley Works or its affiliates and are used under license by GXi Outdoor Power LLC.
No part of this publication can be printed or copied without written permission.
Rev2.5-15-12
IMPORTANT: This unit is shipped without gasoline or oil in the engine. Be 
certain to fill the engine with gasoline and oil as instructed before operating 
your machine. 
 
 
Required tools: Two 13mm wrenches 
NOTE: Both wrenches are supplied in the hardware bag. 
Approximate assembly time: 15 minutes 
1. Remove the chipper from its carton 
Remove plastic banding and cut the tape on the top of the box. 
3. Verify all chipper components are present (Figure 1) 
Item 1: Engine/chipper body/wheels subassembly 
Item 2: Lower leaf funnel section 
Item 3: Upper leaf funnel section with entry shield 
Item 4: Handle section and leaf funnel base 
Item 5: Discharge chute with deflector 
 
NOTE: Fill out and submit missing parts request form on page 4 should 
any parts be missing. 
4. Verify all parts are in the hardware bag (Figure 2) 
 Goggles (eye protection) 
 Wrenches for assembly and blade maintenance 
 Allen wrench for blade maintenance 
 Oil funnel with flexible neck 
 Spark plug wrench 
 Owner’s Manual 
 Hardware: eleven 20mm long bolts, two 30mm long bolts, two 
45mm long bolts, 26 flat washers, 4 locking washers and 11 nylon 
locking nuts 
Figure 2
2. Remove the shipping frame (item 6) from item 1 above 
The steel shipping frame (item 6) is banded to the base of the chipper at 
the engine mounting location. Cut these bands with scissors or a knife 
to remove the chipper from the shipping frame. 
The shipping frame can be discarded. 
Figure 1
1
2
3
4
5
Bolt Identification: 
Place top of bolt head here 
20mm
45mm
30mm
Assembly
6