Assembly – Stanley Black & Decker Stanley Chipper/Shredder With 2-Way Feed CH2 User Manual

Page 13

Advertising
background image

10

STANLEY is a registered trademark of The Stanley Works or its affiliates and are used under license by GXi Outdoor Power LLC.

No part of this publication can be printed or copied without written permission.

Rev2.5-15-12

5. Disconnect The Spark Plug Wire
Before setting up your chipper shredder, disconnect the spark plug wire
from the spark plug and ground against the engine to prevent inadvert-
ent starting of the machine. This step should be taken as a precaution
whenever you are working on this machine.

6. Attaching the chipper discharge chute (Figure 3)
Place discharge chute over rectangular opening on the chipper body. The
plastic discharge chute fits on the outside of the steel chipper body.
The steel liner inside the plastic discharge chute also fits outside of the
steel chipper body.
Attach with four 20mm long bolts with lock washers and flat washers.
No nuts required for these connections.

Figure 3

7. Attaching the lower leaf funnel section. (Figure 4)

The plastic part has a hook shape on the bottom side. The hook shape
slides into the steel track on the chipper body.
When the two parts have been connected, fasten with three 20mm long
bolts, a flat washer on each side, and nyloc nuts.

Figure 4

Figure 5

8. Attach the handle section and leaf funnel base to the upper

leaf funnel with entry shield.


First attach the upper funnel section to the lower funnel section and
align using the large round protrusions and holes. Insert two bolts (one
in each side) in the holes closest to the engine.
Second spread the open end of the upper funnel section and insert the
handle section in the slot on both sides.
Third fasten the components together with the remaining 8 fasteners.
Each bolt should have two flat washers and a nyloc nut.

9. Re-connect the spark plug wire

10. Add oil and fuel.

30mm bolts fasten here

45mm bolts fasten here

Assembly

Advertising