INSTALLATION REQUIREMENTS

User Manual

VanLink System featuring TouchStar™ Technology - Troll Systems Corporation

2-2

Document VLSG-01 - 10/21/08

2.3

INSTALLATION REQUIREMENTS

The Vanlink System components install easily in a standard 19-inch equipment rack.
Physical characteristics of the Vanlink System components are provided in the
applicable assembly drawings. Both standard and custom rack installations must meet
these dimensional requirements in order to properly accommodate the installation of
the controller.

2.3.1

Power Requirements

Power provided at the vehicle must meet either of the following requirements:

120VDC for the V750 Remote Site Controller

120VDC for the Router

120VDC for the V750 Pan and Tilt Controller

2.3.2

Rack Installation

Vanlink System components rack space requirements are as follows:

2.3.2.1

Rack Space Requirements

V750 – Requires two rack spaces

Pan/Tilt controller – Requires two rack spaces unless otherwise specified

EVDO/3G Router – One rack space (not necessarily rack mounted)

2.3.3

Cable Requirements

All applicable cables may be able to be installed (with the ready connectors) after
installing the Vanlink System components into the equipment rack. Connectors and
cables may vary depending upon each customer’s installation requirements.

Cables may be fabricated in the factory. In some cases, customers may choose to
fabricate the cables themselves to custom lengths for the best possible configuration or
fit within their equipment rack. It is recommended to refer to the System Interconnect
Diagram that will accompany your system to determine the cable requirements for your
system.