Troubleshooting & repair, General power supply tests (continued) – Lincoln Electric LN-9 SVM127-A User Manual

Page 107

Advertising
background image

TROUBLESHOOTING & REPAIR

F-49

F-49

LN-9 Wire Feeder

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

GENERAL POWER SUPPLY CHECKS

CHECKPOINT

TEST

CONNECTOR

LEAD NO.

NORMAL

LOCATION

DESCRIPTION

PLUG PIN NO.

ACCEPTABLE

VOLTAGE

READING

CONTROL P.C.

CHECK

BOARD

+15VDC

CONNECTOR

SUPPLY FROM

PLUG

POWER

525(+)

13.5 - 15.5 VDC

BOARD TO

510(-)

CONTROL

10(+)

BOARD

9(-)

CONTROL P.C.

CHECK - 10 VDC

BOARD

SUPPLY FROM

CONNECTOR

POWER

500(-)

9.2 - 10.8 VDC

PLUG

BOARD TO

510(+)

CONTROL

14(-)

BOARD

9(+)

VOLTAGE P.C.

CHECK

BOARD UPPER

+ 15 VDC

CONNECTOR

SUPPLY FROM

PLUG NEXT TO

POWER

525(+)

13.5 - 15.5 VDC

"F" AND “S”

BOARD TO

510(-)

PINS

VOLTAGE

4(+)

BOARD

6(-)

VOLTAGE P.C.

BOARD UPPER

CONNECTOR

510(+)

PLUG NEXT TO

6(+)

"F" AND "S"

CHECK - 10 VDC

PINS

SUPPLY FROM

POWER

9.2 - 10.8 VDC

BOARD TO

VOLTAGE P.C.

VOLTAGE

BOARD LOWER

BOARD

CONNECTOR

500(-)

PLUG NEXT TO

4(-)

PLASTIC

COVERED

RELAY

GENERAL POWER SUPPLY TESTS

(continued)

525

510

500

510

525

510

510

500

Advertising