Lennox Hearth Cambria User Manual

Page 19

Advertising
background image

Roof Down Slope Hole Size

Degree

Of Slope

Secure Temp

ASHT+

Nova Temp

HT6103+

AC

Roof

Pitch

10”

10”

0 *

16-3/8” (416 mm)

17” (432 mm)

2/12

16-5/8” (422 mm)

17-1/4” (438 mm)

4/12

17-1/4” (439 mm)

18” (457 mm)

6/12

18-3/8” (466 mm)

19” (482 mm)

8/12

19-3/4” (500 mm) 20-1/2” (520 mm)

10/12

21-3/8” (542 mm)

22-1/8” (562 mm)

12/12

23-1/8” (588 mm)

24” (611 mm)

Table 3

* Cross Slope Hole Size

CHIMNEY MODEL AC

Collar

Chimney

Flashing

Figure 32

Figure 33

OFFSET CHIMNEY INSTALLATION

After reaching the location requiring the elbow,

proceed as follows. The minimum chimney

height when using elbows is:

OFFSET CHIMNEY INSTALLATION

The minimum chimney height when using elbows is:

Minimum Chimney Height

When Using Elbows

Fireplace Model

Cambria™

Chimney Model

Secure Temp

ASHT+

/ Nova

Temp

HT6103+

/ AC

Vertical Installation

15 feet (4.57 meters)

Two (2) Elbows

18 feet (5.49 meters)

Four (4) Elbows

20 feet (6.10 meters)

Table 4

Note: Must return to vertical before penetrating

ceiling or floor.

After reaching the location requiring the

elbow, proceed as follows:

Secure Temp

ASHT+

/ Nova Temp

HT6103+

Chimneys

1. Install the first elbow; turn it in the required

direction. Fasten it to the chimney with

the three (3) 1/2” (13 mm) metal screws

provided with the elbow.

2. Install the necessary chimney lengths to

achieve the required offset. Lock the chimney

lengths together: it is recommended to use

three (3) 1/2” (13 mm) screws. If the offset

length is made of two (2) chimney lengths

or more, use an offset support halfway up

the offset. If penetrating a wall, install a wall

radiation shield (see Figures 36 and 37).

3. Use another elbow to turn the chimney

vertically. Secure the elbow, using three

(3) 1/2” (13 mm) screws (provided with the

elbow).

4. Use a plumb-bob to line up the center of

the hole. Cut a hole for the chimney in the

ceiling/floor. Frame this hole as described

previously (see Chimney Installation Instruc-

tions on Page 17).

5. From below, install a firestop (See Figure

30a).

6. A support (ST or SO) must be used on the

first 15 feet section (5 m).

7. Continue with the regular installation.

AC Chimney

1. Install the first elbow. Turn it in the required

direction. To lock it in place, turn 1/8 of a

turn. Fasten the straps attached to the elbow

to the surrounding frame, using nails or

drywall screws (Figure 35).

2. Install the necessary chimney lengths to

achieve the required offset. Lock the chimney

lengths together. If penetrating a wall, use

a wall radiation shield.

3. Use another elbow to turn the chimney

vertically. Lock it to the chimney. Fasten

the straps attached to the elbow to the

surrounding framing using nails or drywall

screws.

4. Use a plumb-bob to line up the center of the

hole. Cut a hole for the chimney in the ceiling.

Frame this hole as described previously.

5. From below, install a radiation shield (see

Figure 30b).

6. Continue with the regular installation.

(EL) Replace firestop with radiation shield (done 1-9-08)

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

19

Advertising