Completing the installation, Completing, Installation – Lenovo 6446 User Manual

Page 44

Advertising
background image

1

RAID

controller

4

Battery

mounting

tabs

2

Battery

cable

5

Battery

mounting

clips

3

Battery

6

Battery

cable

connector

9.

Turn

the

new

ServeRAID-8k

SAS

controller

so

that

the

keys

on

the

bottom

edge

align

correctly

with

the

connector.

10.

Firmly

press

the

ServeRAID-8k

SAS

controller

straight

down

into

the

connector

by

applying

pressure

on

both

ends

of

the

controller

simultaneously.

The

retaining

clips

snap

into

the

locked

position

when

the

controller

is

firmly

seated

in

the

connector.

Note:

If

there

is

a

gap

between

the

controller

and

the

retaining

clips,

the

controller

has

not

been

correctly

installed.

In

this

case,

open

the

retaining

clips

and

remove

the

controller;

then,

reinsert

the

controller.

11.

Remove

the

battery

from

the

ServeRAID-8k

SAS

Controller

package.

12.

Slide

the

battery

mounting

tabs

into

the

battery

mounting

clips

on

the

server

wall

that

is

next

to

the

ServeRAID

SAS

controller

connector.

13.

Connect

the

battery

to

the

ServeRAID-8k

SAS

Controller.

14.

Replace

the

air

baffle

over

the

DIMMs.

See

the

User

Guide

for

more

information.

15.

Replace

the

riser-card

assembly.

If

you

have

other

optional

devices

to

install

or

remove,

do

so

now.

Otherwise,

go

to

“Completing

the

installation.”

Notes:

1.

When

you

restart

the

server

for

the

first

time

after

you

install

a

ServeRAID-8k

SAS

controller,

the

monitor

screen

remains

blank

while

the

controller

initializes

the

battery.

This

might

take

a

few

minutes,

after

which

the

startup

process

continues.

This

is

a

one-time

occurrence.

Important:

You

must

allow

the

initialization

process

to

be

completed.

If

you

do

not,

the

battery

pack

will

not

work,

and

the

server

might

not

start.

The

battery

comes

partially

charged,

at

30%

or

less

of

capacity.

Run

the

server

for

4

to

6

hours

to

fully

charge

the

controller

battery.

The

LED

just

above

the

battery

on

the

controller

remains

lit

until

the

battery

is

fully

charged.

Until

the

battery

is

fully

charged,

the

controller

firmware

sets

the

controller

cache

to

write-through

mode;

after

the

battery

is

fully

charged,

the

controller

firmware

re-enables

write-back

mode.

2.

When

you

restart

the

server,

you

will

be

given

the

opportunity

to

import

the

existing

RAID

configuration

to

the

new

ServeRAID

SAS

controller.

Completing

the

installation

To

complete

the

installation,

complete

the

following

steps:

1.

Install

the

cover.

See

“Installing

the

cover”

on

page

31

for

more

information.

2.

Install

the

server

in

the

rack

cabinet.

See

the

Rack

Installation

Instructions

that

come

with

the

server

for

detailed

information

about

how

to

install

the

server

in

a

rack

cabinet.

30

ThinkServer

RD120

Types

6444,

6445,

6446,

and

6447:

Installation

Guide

Advertising
This manual is related to the following products: