Figure 3, Top cable entry routing and installation order, In figure 3 or – Liebert Ship-Ahead Input/Output Cabinet NXL User Manual

Page 15: Figure 3 ), Front view, Side view

Advertising
background image

Installation Drawings

11

Figure 3

Top cable entry routing and installation order

The cables must be routed
around the fault braces. This is
to prevent the cables from
coming in contact with
other busbars.

FAULT BRACE

OUTPUT

FAULT BRACE

RECTIFIER INPUT

FAULT BRACE

BYPASS INPUT

BYPASS NEUTRAL

DC (POSITIVE)

DC (NEGATIVE)

GROUND (TOP ENTRY)

BYPASS INPUT

RECTIFIER INPUT

OUTPUT

OUTPUT NEUTRAL

GROUND
(BOTTOM ENTRY)

FRONT VIEW

DC CONDUIT

Recommended order of installation for cables:

1. DC Power

2. Bypass Neutral

3. Bypass Input Power (Phases A-B-C)

4. Rectifier Input Power (Phases A-B-C)

5. Output Power (Phases A-B-C)

6. Output Neutral

7. Ground

OUTPUT (PHASE C)

RECTIFIER INPUT

(PHASE C)

BYPASS INPUT

(PHASE C)

BYPASS NEUTRAL

OUTPUT NEUTRAL

FAULT BRACE

BYPASS INPUT

FAULT BRACE

RECTIFIER INPUT

FAULT BRACE

OUTPUT

DC (POSITIVE)

DC (NEGATIVE)

BYPASS CONDUIT

INPUT CONDUIT

OUTPUT CONDUIT

SIDE VIEW

Advertising