Figure 4, Bottom cable entry routing and installation order, Figure 4 ) – Liebert Ship-Ahead Input/Output Cabinet NXL User Manual

Page 16: Side view, Front view

Advertising
background image

Installation Drawings

12

Figure 4

Bottom cable entry routing and installation order

SIDE VIEW

FAULT BRACE

OUTPUT

FAULT BRACE

RECTIFIER INPUT

FAULT BRACE

BYPASS INPUT

BYPASS NEUTRAL

DC (POSITIVE)

DC (NEGATIVE)

GROUND (TOP ENTRY)

BYPASS INPUT

RECTIFIER
INPUT

OUTPUT

OUTPUT NEUTRAL

GROUND (BOTTOM ENTRY)

FRONT VIEW

Recommended order of installation for cables:

1.) Output Neutral

2.) Output Power (Phases A-B-C)

3.) Rectifier Input Power (Phases A-B-C)

4.) Bypass Input Power (Phases A-B-C)

5.) Bypass Neutral

6.) DC Power

7.) Ground

OUTPUT (PHASE C)

RECTIFIER INPUT

(PHASE C)

BYPASS INPUT

(PHASE C)

BYPASS NEUTRAL

OUTPUT NEUTRAL

FAULT BRACE

BYPASS INPUT

FAULT BRACE

RECTIFIER INPUT

FAULT BRACE

OUTPUT

DC (POSITIVE)

DC (NEGATIVE)

DC CONDUIT

BYPASS CONDUIT

INPUT CONDUIT

OUTPUT CONDUIT

The cables must be routed
around the fault braces. This is
to prevent the cables from
coming in contact with
other busbars.

Advertising