13 operation scenarios/transfer procedures, Figure 9, See 4.1 - initial system start-up – Liebert Series 610 User Manual

Page 37: Operating instructions 33, Tie open, Module ss, Static bypass switch, Tie closed

Advertising
background image

Operating Instructions

33

4.2.13 Operation Scenarios/Transfer Procedures

Refer to the section listed below each figure for the operational procedure to perform the function

indicated.

Figure 9

From start-up to normal operation, loads to be split between two distribution feeders

Figure 10 From combined loads operation to loads split between two feeders

Figure 11 From continuous tied systems to loads split between two systems

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Open

See 4.1 - Initial System Start-Up.

FROM:

Initial Conditions Prior to Startup

TO:

Normal Operation

Tie Open

LEGEND: M

x

= Module

SS

x

= Static Bypass Switch

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Closed

See 4.2.6 - Returning an Isolated System to Normal

Operation - End Combined Loads Operation.

FROM:

Combined Loads Operation

TO:

Normal Operation

Tie Open

LEGEND: M

x

= Module

SS

x

= Static Bypass Switch

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Closed

See 4.2.11 - Returning Parallel Systems to Normal

Operation - End Continuous Tie.

FROM:

Continuous Tied Systems

TO:

Normal Operation

Tie Open

LEGEND: M

x

= Module

SS

x

= Static Bypass Switch

Continuous Tie

operation for

module out of

service