Figure 12 transfer both load feeders to one ups, See 4.2.5 - transfer of load between two systems, Operating instructions 34 – Liebert Series 610 User Manual

Page 38: From: normal operation tie open, Legend: m, Module ss, Static bypass switch, Tie closed

Advertising
background image

Operating Instructions

34

Figure 12 Transfer both load feeders to one UPS

Figure 13 Both feeders on one system to normal operation

Figure 14 Transfer 100% load on one system to 100% load on a second system (a two-step operation)

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

FROM:

Normal Operation

Tie Open

See 4.2.4 - Isolating a UPS System for Maintenance -

Combined Loads Operation.

LEGEND: M

x

= Module

SS

x

= Static Bypass Switch

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Closed

TO:

Combined Loads Operation

Momentary Tie

for transfer of

Load 2 to

System 1

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Closed

See 4.2.6 - Returning an Isolated System to Normal

Operation - End Combined Loads Operation.

FROM:

Combined Loads Operation

TO:

Normal Operation

Tie Open

LEGEND: M

x

= Module

SS

x

= Static Bypass Switch

See 4.2.5 - Transfer of Load Between Two Systems.

LEGEND: M

x

= Module

SS

x

= Static Bypass Switch

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Closed

TO:

Combined Loads Operation on System 2

Momentary Tie for transfer

of Load 2 to System 2,

then Momentary Tie for

transfer of Load 1 to

System 2

M

1

M

1

SS

1

SS

2

M

2

M

2

System 1

System 2

Load 1 Load 2

Tie

Tie Closed

FROM:

Combined Loads Operation on System 1

Advertising