Plumbing, Sweat connection procedure, Refrigerant metering device – Lennox International Inc. 10ACB User Manual

Page 4: Rfc systems

Advertising
background image

3DJH 

PLUMBING

Field refrigerant piping consists of liquid and suction
lines from the condensing unit (sweat connections) to
the indoor evaporator coil (flare or sweat connections).
Use Lennox L10 (flare) or L15 (sweat, non-flare) series
line sets as shown in table 1 or use field-fabricated re-
frigerant lines. Refer to unit information manual piping
section for proper size, type and application of field--
fabricated lines.

Sweat Connection Procedure

1-- Ends of refrigerant lines must be cut square, free

from nicks or dents, deburred. Pipe must remain
round, do not pinch end of line.

2-- Wrap a wet cloth around the liquid line valve body

and copper tube stub to protect from heat damage
during brazing. Wrap another wet cloth underneath
the liquid valve to protect the base paint.

3-- Quench the joints with a wet cloth to prevent possible

heat damage to the valve core and opening port.

4-- A field provided filter drier should be installed as

close as possible to the expansion device.

REFRIGERANT METERING DEVICE

10ACB units are applicable to either RFCIV or an expan-
sion valve system. See indoor coil installation instruc-
tions and the Lennox engineering handbook for ap-
proved RFC and TXV match-ups and application
information. Table 1 lists 10ACB unit liquid and suction
line sizes and corresponding line sets.

TABLE 1

REFRIGERANT LINE KITS

UNIT

LIQUID

LINE

SUCTION

LINE

L10

LINE SETS

10ACB24

10ACB30

10ACB42

3/8 in

(10 mm)

3/4 in.

(19 mm)

L10--41

20 ft. -- 50 ft.

(6 m -- 15 m)

10ACB18 5/16 in*

(8 mm)

3/8 in

(10 mm)

L10--65

30 ft. -- 50 ft.

(9 m -- 15 m)

L10--21

20 ft. -- 50 ft.

(6 m -- 15 m)

5/8 in

(16 mm)

7/8 in.

(22 mm)

10ACB48

3/8 in

(10 mm)

1--1/8 in.

(29 mm)

FIELD

FABRICATED

10ACB60

*Use reducer supplied in bag assembly.

L15

LINE SETS

L15--41

20 ft. -- 50 ft.

(6 m -- 15 m)

L15--65

30 ft. -- 50 ft.

(9 m -- 15 m)

L15--21

20 ft. -- 50 ft.

(6 m -- 15 m)

FIELD

FABRICATED

10ACB36

10ACB62

NOTE -- Line length should be no greater than 50 feet
(15.2 m). Select line set diameters from table 1 to en-
sure oil return to compressor.

RFC Systems

10ACB units are shipped with an RFCIV metering de-
vice. Replace existing RFCIV in indoor unit with RFCIV
supplied with the outdoor unit. Place the supplied
RFCIV sticker on indoor cabinet after installation. See
table 2 for size of RFCIV bullet shipped in each 10ACB
unit. In cases of non-traditional applications, RFCIV
bullet shipped may not be appropriate. Refer to the in-
door coil installation instructions and the engineering
handbook for specific orifice information.

7$%/( 

5)&,9 '5,// 6,=(6

10ACB UNIT

RFCIV PART #

RFCIV DRILL SIZE

10ACB12

42J35

0.047

10ACB18

42J39

0.055

10ACB24

66J87

0.062

10ACB30

42J45

0.067

10ACB36

42J48

0.073

10ACB42

42J52

0.080

10ACB48

42J54

0.084

10ACB60

42J58

0.092

RFCIV bullet is installed as shown in figure 3. Take care
not to twist cap tubes when loosening seal nut from
orifice body.

4.CIV INSTALLATION

DISTRIBUTOR

“BULLET”

ORIFICE

ORIFICE

BODY

SEAL

NUT

FIGURE 3

SWEAT

CONNECTION

Advertising