Precor S3.15 User Manual

Page 18

Advertising
background image

S3.15 Assembly and Maintenance Guide

page 18

1

2

3

4

5

6

E. Feed the cable over the lower 3½-inch pulley

located in the Press Arm assembly. Attach the
pulley to the Press Arm assembly using
one 2-inch zinc hex head bolt
two zinc flat washers
one zinc locknut

F.

Feed the cable over the upper 3½-inch pulley
located in the Main Upright. Attach the pulley to the
Main Upright using
one 4-inch hex head bolt
two 1

¹⁄₄-inch shoulder spacers

one locknut

G. Pull the slack out of the Main Cable so the ball end

of the cable rests against the Lat Bar Holder.

H. Disassemble the upper pulley in the Double

Floating Pulley as shown. Feed the cable around
the 3½-inch pulley and reattach it using
one 2-inch zinc hex head bolt
two zinc flat washers
one zinc locknut

J.

Feed the cable through the hole in the Upper
Frame Crosspiece and over the two 3½-inch
pulleys attached to the Top Beam assembly.
Reattach the pulleys to the assembly using
two 2-inch hex head bolts
four flat washers
two locknuts

K. Feed the cable down through the hole in the Upper

Frame Crosspiece and attach the threaded end of
the cable into the Selector Stem. Continue turning
the screw three to four full turns to secure the
threads inside the Selector Stem.

L.

Wrench tighten all pulley fasteners.

Important: Do not tighten the jam nut on the
threaded end of the cable or the Double Floating
Pulley fasteners, at this time.

Step 6. Install Main Cable, continued

H

K

J

E

F

G

Double Floating Pulley
Assembly

1 - 2" zinc bolt
2 - zinc washers
1 - zinc locknut

Pull slack and place the
excess cable on the floor
while you assemble the
Double Floating Pulley.

2 - bolts
4 - washers
2 - locknuts

1 - 2" zinc bolt
2 - zinc washers
1 - zinc locknut

Advertising