Polycom SpectraLink 8000 User Manual

Page 18

Advertising
background image

SpectraLink 8000 SVP Server: Administration Guide for SRP

PN: 1725-36032-001_G.doc

18

Use only the provided Class II AC Adapter with output 24VDC, 1A.

2. Plug the AC adapter into an 110VAC outlet to apply power to the

SVP Server.

3. Verify that leakage current ("touch" current) is below 250 μA rms

on exposed metal surfaces.

4. If leakage is excessive, power off the system and re-verify ground

path continuity.

5. The system will cycle through diagnostic testing and the LEDs

will blink for about one minute. When the system is ready for use:

The

ERROR

LED should be off.

— Status 1

should be blinking.

Advertising