Installation checklist, Installation checklist -2 – Paradyne Jetstream CPX-1000 User Manual
Page 66
Advertising

3. Installing the CPX-1000
1000-A2-GN22-00
3-2
February 2003
Installation
Checklist
Photocopy or print these pages as quick reference to the steps
required for successful installation and turn up.
Task
Page Ref
Prepare for Installation (safety information, site preparation)
Unpack and inspect the CPX
Inventory CPX components
Attach mounting flanges
Mount CPX in rack
(optionally mount Splitter Assembly)
Connect plant battery and frame ground to CPX shelf
Install modules (cards) in CPX
Attach OC-3 ATM network cables
Verify hardware installation, (power, ground, and cards)
Attach Ethernet cables, MP to CP cards, and CPX to LAN
Attach CP redundancy cable
Connect CPX to Class 5 switch (Octal T1)
Connect CPX to Class 5 switch (12-port T1)
Attach STS-1 Cables