Chapter 2 - installing the powerstation, Installing the powerstation, Selecting a location – Parker Hannifin PA Series User Manual

Page 12: Underwriters laboratories approval, Nstalling, Ower, Tation

Advertising
background image

PA PowerStation User Guide

2-1

I

NSTALLING

THE

P

OWER

S

TATION

2

Once you have unpacked the PA PowerStation and verified that you have

received all of the components you ordered, you are ready to install the

PowerStation in a permanent location.

This chapter covers the following topics:

Selecting a Location

Preparing for Installation

Installing the PA PowerStation

Selecting a Location

The first step when installing the PA PowerStation is to select an

appropriate location for the unit. This is the most important aspect of the

installation process because the location you select can affect the

PowerStation’s performance, ease-of-use, and life-expectancy. This section

provides some guidelines that you should follow when selecting a location

for the PowerStation.

Underwriters Laboratories Approval

In order to obtain Underwriters Laboratories (UL) approval for your

PowerStation installation, the installation must meet the following criteria:

1

The PowerStation must be mounted in a standard industrial enclosure

that provides fire protection.

2

The PowerStation products have been approved for NEMA Type 4/4X

(indoor) ratings when mounted in a customer provided enclosure

listed Type 4/4X.

Advertising