Precor Low Impact Climber with Pulse 718e User Manual

Page 9

Advertising
background image

Page 9

718e

USA

R

Reed switch cable connector

Upright support

Diagram 6
Attach base column support to
upright support

3.

Secure Upper Frame Pieces Together. (Diagram 6) Gently pull the reed
switch cable from the top of the upright support as you align the bolt holes
in the upright support with the base column support and gasket. Insert the
two mid-frame bolts that you set aside in step 2. Thread the bolts through
the upright support and into the short column. Fully tighten the bolts using
the hex key (G) provided, but be careful not to pinch the cable.

CAUTION: Make sure you do
not crimp the reed switch
cable when you tighten the
base column support onto the
upright support because you
could void the manufacturer’s
limited warranty.

Gasket

Base column support
(short column)

Diagram 7
Install base column support to
base frame

4.

Attach Base Column Support to Base. (Diagram 7) Place a washer (C)
onto each of the two remaining frame-to-base bolts. Place the remaining
gasket between the base column support mount and the base frame. Align
the holes and insert the bolts and washers through the base column
support mount and the climber base. Attach a lock nut (D) to the end of
each bolt. Hold the lock nut with the wrench (H) while you firmly tighten
the bolts with the hex key (G) provided.

Base column support (short column)
Washer
Base column support mount
Gasket
Bolt

Rear crossbar

Advertising