Installing the 4203 t1/e1 ima uplink dsl, Cable ferrite choke – Paradyne IP DSLAM GranDSLAM 4200 User Manual
Page 32
Advertising

2. Cabling
2-8
January 2004
4200-A2-GN20-40
Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke
The 4203 T1/E1 IMA Uplink is shipped with a ferrite choke that must be installed
on the DSL cable(s). One choke can accommodate 1–8 cables.
Procedure
To install the ferrite choke onto the DSL cable(s):
1. Open the ferrite choke and place it around the cable(s) as close to the cable
connector on the uplink module as possible.
2. Close the two halves around the cable and snap the choke shut, pressing
down on the plastic latch to secure it.
3. To prevent the ferrite choke from slipping down the cable, install a tie wrap
behind the ferrite choke as shown.
02-17334
Plastic
Latch
Tie
Wrap
Advertising