Installation instructions, 1 unit structure, 2 fittings – STIEBEL ELTRON SHZ 30 LCD User Manual

Page 16: 3 regulations and provisions, 5 installation location, 6 unit installation, 7 water connection, Technical data

Advertising
background image

16

3. Installation instructions

for the qualified installer

3.1

Unit structure

D

H

L

M

N

15

Control panel

16

Hot water outlet nozzle G ½

17

Cold water inlet nozzle G ½

18

Heating element

19

Parasitic current anode

20

Electronic module (control unit)

21

Reset button of safety thermal cut-out

22

Electronic module (regulation)

23

Safety thermal cut-out

24

Sealing ring

25

Draining valve with hose connection G ¾

26

Aperture for customer provided remote

control of rapid heating in combination

with PG 11

27

Cable aperture PG 21 for electrical

connection

28

Inflow

29

Outflow pipe

30

Suspension bracket, top*

31

Suspension bracket, bottom*

(SHZ 120 LCD, SHZ 150 LCD only)

32

Connection cable for „electronic

modules“

33

Sliding switch for operating modes

34

Sliding switch for output variants

35

Unit connection terminal

36

Temperature sensor

37

Parasitic current anode

38

Customer provided remote control for

rapid heating

39

Customer provided power supply

company contact

* for customer provided screws 12 mm dia.

3.2 Fittings

! Unvented (pressurized) mode of

operation: Safety groups kV 30 or kV 40

F

.

! Vented (pressureless) mode of operation:

Fittings without pressure

G

.

3.3 Regulations and
provisions

! The installation (water and electrical

installation) and first start-up, as well as the
maintenance of this unit may only be
carried out by an approved specialist
installer in accordance with these
Instructions.

! Perfect function and operational safety are

only guaranteed with original accessories
and spare parts intended for the unit.

!

IEE Regulations (electrical).

! Provisions of the local energy supply utility

company.

!

WRC Regulations (water).

! Provisions of the water supply utility

company responsible.

The following are also to be respected:

! The unit rating plate

! Technical data

! Water installation

Pipe material:

– Cold water pipe

– Hot water pipe

Copper pipe

Copper pipe

Steel pipe

Steel or copper pipe

Plastic pipe systems:
Installation also in conjunction with
DVGW-tested plastic pipe system for
cold-water and hot-water pipe systems.

!

Electrical installation
– Electrical connection only with fixed-laid

leads in association with removable

cable bushings.

– The unit must be capable of all-pole

disconnection from the mains, for
example by fuses, with an isolating
distance of at least 3 mm.

3.5 Installation location

!

Install in a vertical position; see

D

.

!

In an area not subject to the risk of
freezing.

!

Install close to the water tap.

3.6 Unit installation

E

!

Fit the suspension bracket.
Select the securing material to suit the
strength of the wall. With SHZ 120 LCD
and SHZ 150 LCD, two suspension
brackets are required.
Any unevenness in the wall is to be
compensated for by the spacer elements

C

provided (a. approx. 5 mm thick).

!

Suspend the unit.

!

Push the cover caps onto the suspension
bracket (b).

3.7 Water connection

!

Unvented (pressurized) for the
supply of several draw-off points.

– Install the type-tested safety groups

F

KV 30, Order No. 00 08 26, up to

0.48 MPa water pipe pressure

KV 40, Order No. 00 08 28, up to 1 MPa

water pipe pressure

a Safety valve

b Backflow preventer

c Test valve

d Throughflow isolating valve (choke)

e Pressure reducer (with KV 40)

f Test nozzle for pressure gauge

g Thermostat fitting TA 260

Order No. 00 34 66 (order

separately), also possible in conjunction
with KV 40.

– Establish dimensions for the outflow pipe

for a fully-opened safety valve. The drain
aperture of the safety valve must remain
open to the atmosphere.

– The drain for the safety group is to be

installed with a constant downwards
inclination.

– The information provided in the

Installation Instructions for the safety
group are to be respected.

– Set a maximum flow rate of 18 l/min at

the choke of the safety group.

!

Vented (pressureless) for the supply
of one single draw-off point

The units are suitable for vented
(pressureless) operation mode.

Do not block off the drain and
fittings pivot arm.

– With this installation the Stiebel Eltron

fittings for vented wall-mounted water
heaters

G

are to be used.

– Before connecting the fitting the water

pipe must be thoroughly flushed through.

– Each time heating takes place, expansion

water will drip out of the drain.

– For use, installation, first start-up, and

maintenance, the same instructions apply
as for the operation of unvented
(pressurized) water heaters.

Technical data

(the data on the unit rating plate are applicable)

Type

SHZ 30

SHZ 50

SHZ 80

SHZ 100

SHZ 120

SHZ 150

LCD

LCD

LCD

LCD

LCD

LCD

Mixed water quantity

l 59

97

159

198

235

292

40 °C (15 °C / 65 °C)

Capacity

l 30

50

80

100

120

150

Weight empty

kg 23.5

30

44

45

50

62.5

Connectable to power

1 - 4 kW

1/N/PE ~ 230 V

sources

1 - 4 kW

2/N/PE ~ 400 V

1 - 6 kW

3/N/PE ~ 400 V

Permissible operating

pressure

0.6 MPa (6 bar)

Table 1

Protection class

EN 60529

IP 25 D

Test marking

See unit rating plate

Water connection

G

½

(external thread)

Flow rate

max. 18 l/min

Dimensions

a

mm

420

510

510

510

510

510

D

b

mm

410

510

510

510

510

510

h

mm

750

720

1030

1030

1190

1425

i

mm

300

300

k

mm

700

600

900

900

900

1100

l

mm

70

140

150

150

310

345

Advertising