Installation, Optional brick panel, Gas pipe pressure testing – Regency E33-NG User Manual

Page 9: Gas insert aeration system

Advertising
background image

9

E33 FPI Direct Vent Gas Insert

OPTIONAL

BRICK PANEL

Optional Brick Panel Set:

Part # Description

Qty

Top (brick) panel

1

Back

(brick)

panel

1

Left

(brick)

panel

1

Right

(brick)panel

1

340-043 Top

bracket

1

340-094 Bottom

clips

2

511-031 Brick clips

2

Diagram 1

GAS PIPE

PRESSURE TESTING

The appliance must be isolated from the gas
supply piping system by closing its individual
manual shut-off valve during any pressure
testing of the gas supply piping system at
test pressures equal to or less than 1/2 psig.
(3.45 kPa). Disconnect piping from valve at
pressures over 1/2 psig.

The manifold pressure is controlled by a regu-
lator built into the gas control, and should be
checked at the pressure test point.

NOTE: To properly check gas pressure, both

inlet and manifold pressures should
be checked using the valve pressure
ports on the valve.

1) Make sure the valve is in the "OFF" posi-

tion.

2) Loosen the "IN" and/or "OUT" pressure

tap(s), turning counterclockwise with a 1/8"
wide fl at screwdriver.

3) Attach manometer to "IN" and/or "OUT"

pressure tap(s) using a 5/16" ID hose.

4) Light the pilot and turn the valve to "ON"

position.

5) The pressure check should be carried out

with the unit burning and the setting should
be within the limits specifi ed on the safety
label.

6) When fi nished reading manometer, turn

off the gas valve, disconnect the hose and
tighten the screw (clockwise) with a 1/8"
fl at screwdriver. Note: Screw should be
snug, but do not over tighten.

INSTALLATION

GAS INSERT

AERATION SYSTEM

The air shutter can be adjusted by moving the
adjusting wire up or down. The wire is accessed
through the bottom louver opening. Open the air
shutter for a blue fl ame or close for a yellower
fl ame. The burner aeration is factory set but
may need adjusting due to either the local gas
supply or altitude.

Minimum Air Shutter Opening:
5/16"

Natural

Gas

7/16"

Propane

CAUTION: Carbon will be produced if air

shutter is closed too much.

SIT Valve Description

1) Gas

cock

knob

2) Manual

high/low

adjustment

3) Pilot

Adjustment

4) Thermocouple

Connection

-

option

5) Manifold (Outlet) Pressure Tap
6) Inlet

Pressure

Tap

1

2

3

4

5

6

IN

OUT

Note: Any damage due to carboning result-

ing from improperly setting the aera-
tion controls is NOT covered under
warranty.

Note: Aeration Adjustment should only

be performed by an authorized FPI
Installer at the time of installation or
service.

Installation of Brick Panels:
1)
Remove top louver and glass door if in-

stalled.

2) Remove the logs if they are already in

stalled. Note: the grate must be removed in
order to remove the bottom log. Ensure you
slide the bottom coal off to the right-hand
side to avoid chipping.

3) Unwrap the brick pattern panels from the

protective wrapping. Handle the panels with
care as they can break easily.

4) Remove the two screws from the bottom of

the baffl e plate. Install the bottom clips onto
the baffl e plate (refer to Diagram 1).

Bottom Clips

7) Pilot

Outlet

8) Main Gas Outlet
9) Alternative

TC

Connection

Point

Advertising
This manual is related to the following products: