Multi-tier installation – Raritan Computer II User Manual

Page 92

Advertising
background image

82

P

ARAGON

II U

SER

M

ANUAL

Multi-Tier Installation

In a multi-tier configuration, the order of powering ON is critical to proper function.

•

Last tier switches must be powered ON before the intermediate level of tier

•

Intermediate tier switches must be powered ON before the base Paragon II unit can be powered ON.

•

User Stations (UST1s) can be powered ON and OFF at any time as needed.

•

There is a five-second ON/OFF down time in the UST1 or Paragon II power cycle.





Advertising