Installation – Regency NATURAL GAS U32-NG4 User Manual

Page 16

Advertising
background image

16

U32-4 FPI Direct Vent Gas Insert

28) Run the other end of the ground wire

and DC spark generator wires through
the bushing on the heat shield.

30) Plug the DC spark generator wires to the

DC Sparker.

31) Connect the ground wire to the DC Sparker

mounting bracket.

Heat Shield

34) Find a location which is not too hot and

is easy to reach for changing the battery.

Note: It should be kept away from the
chain.

35) Tie up the loose wires with the wire clip.

Chain

36) Check for gas leaks.

37) Check inlet and outlet pressures.

38) Check operation of fl ame control.

39) Check for proper fl ame appearance and

glow on logs.

NOTE: The battery in the DC Sparker

Box will need to be replaced an-

nually.

25) Connect the DC spark generator wires

to the SIT Valve with the screw, which is
provided in the kit.

26) Locate the ground lug.

27) Connect one end of the supplied green

ground wire to the lug with the nut and
washer from the kit.

Ground

wire from

kit

29) Install the 1/2" bushing to the heat

shield.

33) Mount the heat shield to the DC Sparker.

Secure into place with the velcro, which is
provided in the kit.

For P36D-1 / P36-4 Only:

26a) By the receptical box, left of the unit.

For U32-4 Only:

26b) Located on the left side of the unit.

32) Install the supplied battery into the DC

Sparker Box by opening the battery
compartment.

Battery

Compartment

INSTALLATION

Advertising
This manual is related to the following products: