Vi. general assembly instructions – Oneida Air Systems 10 HP User Manual

Page 10

Advertising
background image

VI. General Assembly Instructions

9

O.A.S. 2007

c

10 HP Pulley Drive Owner’s Manual

1. Determine mounting height for the cyclone.

- Height depends on size of Dust Bin and length

of Flex Hose to Dust Bin connection.

2. Mount Angle Iron Brackets to wall using included

hardware.

3. Mount Cyclone Barrel to Wall Brackets.

- Determine inlet orientation. Fasten Cyclone to

Brackets with one bolt on each side. Drill new

hole in ring if needed for your orientation.

6. Connect Cyclone Cone to Barrel using included

Clamp Ring.

- Seal around Clamp Ring with silicone.

7. Connect 14 to 10 Reducer to bottom of Cone.

8. Connect Sleeve Kit to Cyclone Cone and Dust Barrel

using included Band Clamps.

For cyclonic preseparation there must be an air

tight seal between cyclone and dust container.

Dust bin must be located vertically under cyclone.

Material drops down by gravity.

Inlet

Cyclone

Barrel

Angle Iron

Wall Brackets

Clamp

Ring

Cyclone

Cone

14 to 10

Reducer

Sleeve

Kit

55 Gal.

Steel

Drum

- Seal around Reducer with silicone.

Ideas for make your own Dust Bins:
- 55 gal. drum, metal or rigid plastic garbage can,

air-tight plywood box.

Note: You can make a lid using plywood lined with some

type of gasket material (Carpet Foam).

(Continued on next page.)

4. Lower V - Tube into Cyclone Barrel

5. Connect Outlet Cyclone Barrel to Inlet Cyclone

Barrel using included Clamp Ring.

V - Tube

Outlet

Cyclone

Barrel

Clamp

Ring

Advertising