Quartz QZ3111 User Manual

Page 6

Advertising
background image

Quartz Thermo installation guide

page 6

Set the temperature control lever to full cold

(9 o’clock) prior to removing the four screws

securing the lever to the valve. Carefully remove

the temperature lever to reveal the lilac

temperature preset override ring and the white

temperature preset location ring. Neither of

these parts need to be removed for installation.

However if they are removed please take a note

of their orientation on the valve prior to

removal (as illustrated).

5

Carefully remove the shroud from the valve

assembly.

6

If the valve is being installed for use with a

gas fired instantaneous (multipoint) water

heater or a combination boiler, the cold

water flow regulator must be fitted at this

stage by insertion into the cold water port

as shown (the flow regulator is supplied in its

own pack).

7

The Quartz Thermo valve is supplied with an outlet cap on the bottom of the

valve allowing for a top outlet connection. The bottom outlet can be used by

simply removing the cap and repositioning it on the top outlet. If the cap is

removed please ensure that when replaced, the membrane in the cap is in

place and that the cap is done up tight.

9

Fit the outlet connector ensuring the rubber

washer is correctly engaged (supplied in the

screwpack), on the required outlet ensuring

a tight fit. Offer the valve up to the required

fixing position to check the four fixings

points are correct and there is adequate

space available around both inlet elbows

and outlet connector.

Prepare the wall fixings as required.

10

Fit the elbows to the valve body hand tight, ensuring that the rubber washers

are correctly engaged (these are supplied in the screw pack).

8

Advertising