The installation may now be checked for leaks.

Temporarily cap off the outlet supply pipe.

Push the on/off lever assembly onto the front

of the valve fully home and turn the knob fully

clockwise to ensure the valve is fully turned off.

The on/off shaft is manufactured with a flat

area. The corresponding flat area in the on/off

lever must be in alignment before the knob

can be fitted.

14

Construct a suitable 15mm outlet supply to a suitable point for the wall outlet.

Using a silicone based lubricant, lubricate the 15mm outlet pipe and push into

the outlet assembly fully home (outlet pipe insertion depth is 24mm).

12

Using a silicone based lubricant, lubricate

the supply pipe ends and whilst supporting

the elbows, push home the supply pipes

ensuring the correct orientation for the inlet

pipes (HOT LEFT AND COLD RIGHT AS

SHOWN ON THE VALVE BODY). Push the

valve fully home until a definite stop is

reached (tube insertion depth is 25mm).

Secure the valve assembly to the fixing

surface using the screws provided.

11

Using a suitable tool, tighten both the elbow nuts and outlet connector nut

until water tight.

13

!

Place the mortar guard around the valve and

fill in the chase. Once the in-filling material

has set, carefully remove the polystyrene to

expose the valve body.

THE MORTAR GUARD MUST BE USED

16

!

Turn on the supplies and check for any leaks upstream of the valve. Slowly

open the control and check for leaks downstream of the valve. If all is sound,

turn off the on/off knob fully, turn off the supplies and remove the on/off

lever assembly.