Step 3: prepare duct cutouts in cabinet, Step 3: prepare duct cutouts in step 3: cabinet – Thermador UCVM30FS User Manual

Page 14

Advertising
background image

14

Countertop
Surface

Point "P" (Center of Rear Cut-line)

Cabinet Back

Cabinet Bottom Shelf

Left Side

Note: Centerlines of

Rectangular Duct Shown

Plumb line to
intersection A-A
& B-B

Receptacle
Location

Right Side

E

Adjustable
Within Range

Fig. 9

C

6 3/8”

14 1/2”

1 7/8”

15 1/2”

9 3/4”

D

E

F

G

Cabinet Cutout Dimensions for Blower:

Table 4

Step 3: Prepare Duct Cutouts in
Cabinet

A. Refer to Figure 9. Drop a plumb-line from

Point ”P” at the rear center of the
countertop cutout. Mark this point on the
bottom of the cabinet below. Construct
two reference lines through this point:
one should be parallel to the cabinet
front and directly below the rear counter-
top cutout (Line A-A), and the other (Line
B-B) should be at right angles to A-A.

B. Using these reference lines as a base for

the measurements shown in Table 4,
layout the necessary cabinet cutouts
needed to implement the planned
ductwork route. Where a range of
measurements is noted, choose a
measurement that allows best clearance
from wall studs, floor joists, utilities, or
other obstructions.

Step 3: Prepare Duct Cutouts in
Step 3: Cabinet

C. Temporarily set intake and cooktop in

place and attach integral blower (or duct
transition fitting if a remote blower is
installed). Refer to steps 6 and 7. Verify
that the duct cutouts as marked will
match the hardware installation. Adjust
the duct cutout as necessary to match
hardware installation.

D. Remove temporarily placed hardware

and make cutouts in cabinet to
accommodate ductwork installation.

E. Make all other cabinet modifications

needed to provide proper clearances for
drawers or removable shelving.

Advertising
This manual is related to the following products: