Assembly, Temperature gauge mounting, Bengal brute hose routing – Tiger BENGAL BRUTE JD 62-6420 User Manual

Page 49

Advertising
background image

ASSEMBLY

Assembly Section 2-17

TEMPERATURE GAUGE MOUNTING

(OPTIONAL)

Mount the temperature gauge where it is clearly visible to the operator. Attach the green (-)

wire from the negative post on the gauge to a grounded bolt on the tractor frame. Remove paint
if needed to make a good ground. Remove the pipe plug from the side of the hydraulic reservoir
and install the temperature sensor using thread sealing tape. Run the white wire from the (s)
sensor post of the gauge to the temperature sensor on the hydraulic reservoir tank.

(ASM-C-0051)

BENGAL BRUTE HOSE ROUTING

WARNING NOTE:

The sudden release of hydraulic pressure could cause the sudden

movement of very heavy parts. Anyone in the way of these parts could be severely hurt or killed.
DO NOT ALLOW these hydraulic hoses to BREAK or BURST in order to prevent hydraulic failure
Make sure the hoses do not pinch or stretch as boom moves. Measure TWICE, check TWICE
then proceed with caution.

Route the hoses through the space between the swivel and the boom mounting bracket.

Connect the hoses to the preformed tubes and move the boom arm to a few feet from full
forward. Assemble the swivel clamp and place the return hose for the motor on top and the
pressure line on the bottom. Place the ¼” hoses in the “C” clamp and add it to the bottom screw
of the swivel clamp. Next, make sure there is enough slack for all hoses to pivot at the joint
where the main boom arm bends in the swivel, as shown in the next image, and tighten the
hoses in the clamp.

(ASM-BRUTE HOSE ROUTING-0001A)

Advertising