Thermador HSB User Manual

Page 13

Advertising
background image

Page 13

three or four studs as available.

Countersink the heads to pre-

vent interference with the

hood.

8.

On the wood bracket mark the

locations used to hang the hood

according to Figure 7.

9.

Drill a 1/8” tap hole through

the wooden bracket and drywall.

These screws do not need to go

into the studs.

10.

Screw 2 (4.2mm x 18 mm)

screws into the wood bracket

leaving 1/4” of the screw ex-

posed for hanging the hood.

11.

Discharge Direction: Horizon-

tal discharge requires a wall

cutout, as shown in Figure 1 of

this manual, to provide clear-

ance for the transition. The

location of the cutout is deter-

mined by the hood installation

height.

For Vertical discharge,please

refer to step 4, Page 10.

12.

Hang the hood using slots I in

Figure 8. Make sure the wood

bracket fits into the recess on

the back of the hood.

13.

Tighten the screws in slots I.

Use slots I to level the hood.

14.

From inside the hood drive 4 or

6 screws depending on model

(4.2 mm x 18 mm) through holes
J

into wooden bracket.

15.

Drill a 3/8” tap hole through

the center of the holes K into

the wall. Insert two wall plugs

into drilled holes. Tighten hood

to wall anchors by installing 2

screws with washers.

J

I

K

Figure 8

Advertising
This manual is related to the following products:

HS