Blue bag – Vision Fitness ST730 User Manual

Page 10

Advertising
background image

10

2

STEP

• With the weight stack tower (AB1)
standing upright, slide it against the
T-shaped bracket at the end of the main
floor support (AT1) (with the “Front” sticker
facing the rest of the machine). Line up the
holes at the bottom of the weight stack
tower with the holes in the main floor
support. Secure the connection with two
bolts (M10x70), four flat washers
(10.2x22x2), and two nylon nuts (M10).

BLUE BAG

AT1

AT1

AB1

AB1

“Front” Sticker

Advertising