Pink bag – Vision Fitness ST730 User Manual

Page 11

Advertising
background image

11

3

STEP

• Secure top and bottom shield brackets
(B10) to weight stack tower using bolts
(M5x10), lock washers (5.1x9.3x1.3),
and flat washers (5.3x10x1.0) provided.
Repeat for all side brackets (BO9).

• Place two rubber weight plate bumpers
(Z25) over the holes in the lower cross
tube of the weight stack tower. With the
horizontal holes of the guide rods at the
top, place the guide rods (KO5) over and
through the rubber weight plate bumpers
into the weight stack tower (AB1). Let the
guide rods tilt forward from the tower.
Slide each of the 20 weight plates (KO2)
over both of the guide rods on top of one
another. Place the header weight plate
(KO1) over both guide rods on top of
other weight plates. Slide the stopper ring
(Z39) over the top of the right guide.
Position the bottom edge of the ring 11.5”
from the top edge of the guide rod.
Tighten the set screw firmly.

• Make sure rubber guide rod sleeves
(Z24) are in place in top holes of the
weight stack tower. Lift the guide rods into
top of weight stack tower until holes in the
guide rod are lined up with the horizontal
holes on the top of the weight stack tower.
Insert a bolt (M8x62) and flat washer
(8.4x15.5x1.6) through each guide rod
and fasten with a flat washer
(8.4x15.5x1.6) and a nut (M8).

• Remove the nut from pulley bracket E.
Slip the loose end of the weight selector
tether around the threaded rod of pulley
bracket E. Thread the nut back on. Thread
pulley bracket E at 0.75” into the header
plate (K01). Tighten nut to the weight
selector rod. Make sure the pulley bracket
is positioned parallel to the guide rods.

PINK BAG

B10

B10

B09

B09

Z25

Z25

K05

K05

AB1

AB1

K02

K02

K01

K01

Z24

Z24

Z39

Z39

E

Advertising