Cable #2 – Vision Fitness ST700 User Manual

Page 14

Advertising
background image

14

H

I

6

STEP

Remove slotted bolt and nut from the end of
the cable. With slotted bolt end of Cable
#2 in hand, run cable through Pulleys H and
I. Reattach the bolt and nut, and thread into
bottom of floating cable anchor (AF1) a
minimum of 0.5”. Tighten nut against cable
anchor.

CABLE #2

Advertising