Assembly instructions – Vogelzang International PB65XL User Manual

Page 4

Advertising
background image

Page 4

/ PB65XL

Vogelzang International Corp.

VGZ-003 / 20120327.0

tools

required

CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.

Refer to diagram and parts lists at back of this manual.
1. Uncrate the stove and remove all protective packing

materials and protective poly bag. (Save cardboard
carton for further assembly.)

2. Remove par ts from inside of stove. Par ts

include: one lid (#1), one lid lifter (#2), one ash door
(#16) with one slide draft (#17), one ash drawer
(#19), four legs (#15), hardware pack (#21), draft
damper (#20), and one Spring Handle (#9) from
inside the firebox.

3. Place flattened carton on floor and carefully turn

stove over onto carton.

4. Securely attach all four legs to base of stove with

stove bolts.

5. Carefully lift stove upright and place in desired

location (see following instructions for properly
locating stove from combustible materials).

6. Place lid (#1) in position on top plate.
7. Place ash drawer (#19) into lower chamber (#13).

Position ash door (#16) with slide draft (#17) on
front of lower chamber (#13).

8. Place shaker grate (#12) in lower chamber.

ASSEMBLY INSTRUCTIONS

materials

required

(NOTE: The following items are NOT included with your stove)

9. Install flue pipe

draft damper (#20) into the top

end of the first straight section of stove pipe (fig.1)
exiting the stove

before the stove is used.

a. Drill two 1/4” holes centered on either side of the

pipe section 6” from the top end of the pipe (figure
1).

b. Remove the handle from the damper then slide the

damper into the pipe.

c. Align the damper with the holes drilled in step 9a

and insert the handle through the holes and the
damper.

NOTE: THIS DAMPER IS NECESSARY FOR THE
PROPER OPERATION OF THE STOVE AND
TO MEET EPA EMISSIONS REQUIREMENTS
FOR HEATING APPLIANCES. IT MUST BE IN-
STALLED BEFORE USE. (NO EXCEPTIONS)

10. Attach stove piping — see instructions on page 5.

1/8” dia. Drill Bit

(sheet metal screws)
Phillips Style Screwdriver
14mm Nut Driver or Ratchet

with 14mm Socket (for 14mm

Hex Nuts & Stove Bolts)

Safety Glasses

Hearth Gloves
Pencil
6 foot Folding Rule or

Tape Measure
Tin Snips
Drill: Hand or Electric

Flooring Protection: 54” x 63”
min. as specified (see page 4)
Chimney Connection: 6” black
steel (24 ga. min.) straight or
elbow (as required)
1/2” Sheet Metal Screws

Chimney: Existing 6” Lined Ma-
sonry Chimney or 6” Inside Dia.
manufactured chimney system
listed to UL 103 HT.
Furnace Cement (manufacturer
recommends Rutland Code 78
or equivalent)

6"/15.25 cm

DRAFT DAMPER

(must be installed

before use — NO

EXCEPTIONS!)

NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or maintenance of
your wood stove and assumes no responsibility of any incidental or consequential damages.

Fig. 1 – Draft

Damper Installation

Advertising