Green bag – Vision Fitness ST740 User Manual

Page 14

Advertising
background image

14

4

STEP

• Secure top and bottom shield brackets
(Q08) to weight stack tower using bolts
(M5x10), lock washers (5.1x9.3x1.3),
and flat washers (5.3x10x1) provided.
Repeat for all side brackets (Q09).

• Place two rubber weight plate bumpers
(Z39) over the holes in the lower cross
tube of the weight stack tower. With the
horizontal holes of the guide rods (K05) at
the top, place the guide rods over and
through the rubber weight plate bumpers
into the weight stack tower. Let the guide
rods tilt outward from the tower. Slide each
of the 20 weight plates (K02) over both of
the guide rods on top of one another. Place
the header weight plate (K01) over both
guide rods on top of other weight plates.

• Make sure rubber guide rod sleeves
(Z38) are in place in top holes of the
weight stack tower. Lift the guide rods into
top of weight stack tower until holes in the
guide rod are lined up with the horizontal
holes on the top of the weight stack tower.
Insert a bolt (M8X62) and flat washer
(8.4X15.5X1.6) through each guide rod
and fasten with a flat washer
(8.4X15.5X1.6) and a nut (M8).

GREEN BAG

Z38

Z38

K05

K05

K01

K01

Q09

Q09

Q08

Q08

K02

K02

Advertising