Control box installation – Viking Access Systems Vehicular Gate Opener X-9 User Manual

Page 18

Advertising
background image

TECHNICAL SUPPORT 1 800 908 0884

15

16

CONTROL BOX INSTALLATION

CONTROL BOX INSTALLATION

2. Position the control box in the desired

place and mark the mounting holes.
Prepare the holes to receive the
anchors/fasteners.

15" Standard
17" Industrial

Depth:
6.5" Standard
6.5" Industrial

14" Standard
16" Industrial

1. Remove the control board mounting plate.

The plate is held in the box by four
screws.

3. Position the control box and secure it to

the mounting surface using the sealed
washers provided (place the rubber side
of the washers against the inside of the
control box).

Mounting Surface

Control Box

Sealed Washer

(Supplied with Unit)

Mounting Fastener

(Customer Supplied)

WARNING - If the control box is not

mounted properly it may fall, causing
damage and/or injury. The control box
weight is approximately 40 lbs. Be sure
that the substrate being mounted to and
the fasteners being used are appropriate
to support the weight of the control box.

Note: Depending on type of anchor used, it

may be necessary to enlarge the
mounting holes in the control box.

Advertising
This manual is related to the following products: