Cable assembl y arm assembl y – Weider WESY19002 User Manual

Page 12

Advertising
background image

18

15

48

47

Bracket

Lubricate

Axle

55

65

68

45

44

47

16

17

CABLE ASSEMBL

Y

ARM ASSEMBL

Y

12

15. Press a 1 3/4” Square Inner Cap (44) into the

lower end of the Left Arm (47). Using a small
amount of soapy water, slide a Large Foam
Pad (45) onto the Left Arm.

Assemble the Right Arm (48, not shown) in
the same manner.

16. Lubricate both axles on the Top Frame (55).

Slide the Right Arm (48) onto the right axle.
Note: Be careful not to confuse the Right
Arm with the Left Arm (47). Make sure that
the upper end of the Right Arm is behind
the indicated bracket on the Top Frame (55).

Tap two 1” Retainers (68) and a 1” Round
Outer Cap (65) onto the right axle. Make sure
the teeth on the Retainers bend toward the
Round Outer Cap, as shown in the inset
drawing.

Attach the Left Arm (47) in the same manner.

17. Important: As you assemble the cables in

steps 17–30, refer to the CABLE DIAGRAM
on page 21 for correct cable routing.

Route the Short Cable (23) up through the
hole in the Top Frame (55) as shown. Make
sure the ball is on the indicated side. Attach a
“V”-Pulley (6) to the hole in the Top Frame
using a 3/8” x 3 1/4” Bolt (8), two 3/8” Washers
(9), two 5/8” x 1/2” Spacers (82), and a 3/8”
Nylon Locknut (21) as shown. Do not over-
tighten the Nylon Locknut; the Pulley must
be able to turn freely.

18. Route the Short Cable (23) around another

“V”-Pulley (6). Hold a Long Cable Trap (50)
against the Pulley so that it secures the Short
Cable in the groove of the Pulley.

Attach the “V”-Pulley (6) and the Long Cable
Trap (50) to the bracket (not shown) on the
Top Frame (55) using a 3/8” x 2 1/4” Bolt (76)
and a 3/8” Nylon Jamnut (67). Do not over-
tighten the Nylon Jamnut; the Pulley must
be able to turn freely.

76

67

55

50

6

21

82

55

Ball

82

9

9

8

23

23

6

65

68

Advertising