Tools Needed:
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.
To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at
www.wayne-dalton.com
If you just removed your existing door or you are installing a 
new door, complete all steps in PREPaRING ThE OPENING. 
To ensure secure mounting of track brackets, side 
and center brackets, or steel angles to new or retro-fit 
construction, it is recommended to follow the procedures 
outlined in DasMa Technical Data sheets #156, #161 and 
#164 at www.dasma.com.
The inside perimeter of your garage door opening should 
be framed with wood jamb and header material. The jambs 
and header must be securely fastened to sound framing 
members. It is recommended that 2” x 6” lumber be used. 
The jambs must be plumb and the header level. The jambs 
should extend a minimum of 12” (305 mm) above the top of 
the opening for TorqueMaster counterbalance systems. For 
low headroom applications, the jambs should extend to the 
ceiling height. Minimum side clearance required, from the 
opening to the wall, is 3-1/2” (89 mm).
IMPORTANT: ClOsEly INsPECT jaMbs, hEaDER aND
MOuNTING suRFaCE. aNy WOOD FOuND NOT TO bE sOuND, 
MusT bE REPlaCED.
For TorqueMaster counterbalance systems, a suitable 
mounting surface (2” x 4”) must be firmly attached to the 
wall, above the header at the center of the opening. 
NOTE: Drill a 3/16” pilot hole in the mounting surface to
avoid splitting the lumber. Do not attach the mounting 
surface with nails.
weather Seal (May Not Be Included):
Cut the weather seal (if necessary) to fit header and jambs.
for quick install track: align the header seal with the inside
edge of the header and temporarily secure it to the header 
with equally spaced nails. Next, fit the jamb seals up tight 
against the header seal and flush with the inside edge of 
the jamb. Temporarily secure the jamb seals with equally 
spaced nails approximately 12” to 18” apart. This will keep 
the bottom section from falling out of the opening during 
installation.
for fully adjustable track: align the header seal 1/8” to
1/4” inside the header and temporarily secure it to the 
header with equally spaced nails. Next, fit the jamb seals 
up tight against the header seal and 1/8” to 1/4” inside 
the jamb. Temporarily secure the jamb seals with equally 
spaced nails approximately 12” to 18” apart. This will keep 
the bottom section from falling out of the opening during 
installation.
NOTE: Do not permanently attach weather seal to the jamb
at this time.
hEADROOM REqUIREMENT: headroom is defined as the
space needed above the top of the door for tracks, springs, 
etc. to allow the door to open properly. If the door is to be 
motor operated, 2-1/2” (64 mm) of additional headroom is 
required.
NOTE: 6” lhR Conversion kit is available for 12” Radius only.
Contact your local Wayne-Dalton dealer.
BACkROOM REqUIREMENT: backroom is defined as the
distance needed from the opening back into the garage to 
allow the door to open fully.
Preparing the Opening
WEaThER sEal
hEaDROOM
baCkROOM
DOOR
WIDTh
DOOR
hEIGhT
lEVEl hEaDER
PluMb jaMbs
hEaDER bOaRD
2” x 6” luMbER
PREFERRED
suITablE MOuNTING suRFaCE
2” x 6” luMbER MINIMuM
P5
Recommended
tools from
page 5
hEaDER
jaMb
jaMb
DOOR hEIghT TRACk
MANUAL LIfT
MOTOR
OPERATED
6’6”, 7’0” 15” Radius 98” (2489 mm) 125” (3175 mm)
8’0”
15” Radius 110” (2794 mm) 137” (3480 mm)
BACkROOM REqUIREMENT
hEADROOM REqUIREMENT
TRACk TYPE
TorqueMaster
®
15” Radius track
12-1/2” (318 mm)
wEAThER SEAL
quICk INsTall TRaCk
Fully aDjusTablE TRaCk
jaMb
WEaThER
sEal
1/8” TO 1/4”
WEaThER
sEal
jaMb
DOOR
sTOP
DOOR
sTOP
DOOR
sECTION
DOOR
sECTION
jaMb
jaMb
1/8” TO 1/4”