Annual startup and general maintenance, User’s information manual, Owner maintenance – Weil-McLain ULTRA 550-100-067/0608 User Manual

Page 5

Advertising
background image

Part number 550-100-067/0608

5

gas

-

fired

water

boiler

— User’s Information Manual

Annual startup and general maintenance

Figure 1

Service and maintenance schedules

OWNER MAINTENANCE

(see the following pages for instructions)

BEGINNING OF SEASON

Contact your boiler service technician to inspect, service and start
up your boiler. You must have an annual start-up performed by a
qualified service technician to ensure reliable operation of the boiler
and system.

DAILY

Check boiler area

Check air openings

Check pressure/temperature gauge

Verify boiler front door is secure

MONTHLY

Check vent piping

Check air piping

Check relief valve

Check condensate drain system

Check automatic air vents (if used)

PERIODICALLY

Test low water cutoff (if used)

Check time and date on the U-Control display

EVERY

6 MONTHS

Check boiler piping (gas and water)

Operate relief valve

END

OF SEASON

Shut boiler down (unless boiler used for domestic water)

Follow the service and maintenance procedures given throughout this manual and in component literature

shipped with the boiler. Failure to perform the service and maintenance could result in damage to the boiler or

system. Failure to follow the directions in this manual and component literature could result in severe personal

injury, death or substantial property damage.

Advertising