Weider PRO POWER STACK 831.159831 User Manual

Page 17

Advertising
background image

17

38

93

32

74

35

38

38. Wrap the Ab Cable (74) around a 3 1/2” Pulley

(35) in the direction shown. Attach the Pulley and
a Cable Trap (38) to the forth set of holes from
the bottom in the indicated pair of Pulley Plates
(32) with a 3/8” x 2” Bolt (93) and a 3/8” Nylon
Locknut (90). Make sure the Cable Trap is posi-
tioned to hold the Cable in the groove of the
Pulley.

37. Wrap the Ab Cable (74) around a 3 1/2” Pulley

(35) in the direction shown. Attach the Pulley to
the indicated bracket on the Center Base (2) with
a 3/8” x 3 3/4” Bolt (101) and a 3/8” Nylon
Locknut (90). Make sure the Cable is routed in
the direction shown.

Note: The 3/8” x 3 3/4” Bolt (101) must be
inserted through both brackets on the Center
Frame (2). Tighten the 3/8” Nylon Locknut (90)
only a few turns onto the Bolt; it will need to
be removed in step 39.

39

74

35

35

35

92

90

101

2 95

94

2

35

74

Bracket

38

39. Remove the 3/8” x 3 3/4” Bolt (101) and the 3/8”

Nylon Locknut (90) used in step 37.

Wrap the Ab Cable (74) around a 3 1/2” Pulley (35)
in the direction shown. Attach the Pulley to the indi-
cated bracket on the Center Base (2), and the
3 1/2” Pulley (35) used in step 37 to its bracket,
with the 3/8” x 3 3/4” Bolt (101) and the 3/8” Nylon
Locknut (90). Note: Make sure the Pulley used
in step 37 is attached as shown.

Wrap the Ab Cable (74) around a 3 1/2” Pulley
(35) in the direction shown. Slide the Pulley and a
Cable Trap (38) onto the 3/8” x 3 1/2” Carriage
Bolt (95) in the Center Base (2). Secure the
Pulley with a 3/8” Nylon Jamnut (92). Make sure
the Cable Trap is positioned to hold the Cable
in the groove of the Pulley.

40

40. Lay the Ab Cable (74) inside the indicated bracket

on the Center Base (2). Attach a 3 1/2” Pulley
(35) inside the bracket with a 3/8” x 1 3/4” Bolt
(94) and a 3/8” Nylon Jamnut (92).

37

74

101

90

2

35

90

92

Advertising