Westell Technologies 36R570 User Manual

Page 8

Advertising
background image

ADSL WireSpeed Pro 36R570 Proxy Router

User Guide

030-300153A

8

WireSpeed Pro Installation

7. The Ready LED should be a solid green indicating that the power self-test has successfully completed and the unit

is synchronized with the ADSL line card. It may take up to 70 seconds for the unit to synchronize with the central
office ADSL unit.

8. The Link LED should be solid green indicating that the CPE connection has been made.

9. During use, a pulsing yellow Activity LED indicates that data is being transmitted and received on the Ethernet

interface.

10. Go to page 16, “Setting Up Your WebShare Account” to configure the software.

PRINTER

PC

PC

PC

ETHERNET HUB

PORT 1

PORT 2
PORT 3

PORT 4

UPLINK

All connections made with
10BaseT Straight-through
cable with RJ45 plug
terminations

Figure 2. Typical WireSpeed Pro Multi-User Setup Connections

Advertising