Schedule a report to run, Enter a name for the event – 8e6 Technologies Enterprise Reporter ER HL/SL User Manual

Page 31

Advertising
background image

C

ONFIGURE

, T

EST

THE

E

NTERPRISE

R

EPORTER

C

REATE

A

C

USTOM

R

EPORT

FOR

A

SPECIFIC

USER

8

E

6 T

ECHNOLOGIES

, E

NTERPRISE

R

EPORTER

E

VALUATION

G

UIDE

27

Schedule a report to run

Once a report view has been saved, it can be scheduled to run at a designated
time.

To schedule a report to run:

1. Go to the Settings menu in the navigation panel and select Event Schedule. The

Event Schedule option is used for maintaining a schedule for generating a
customized report.

Event Schedule window (administrator login)

If logged in as the administrator, all scheduled events display. If logged in as a
manager, only the events scheduled by that manager login ID display. If the
Web Client Scheduler is turned off, the message “To view event schedules,
please enable Web Client scheduler using ER Admin GUI.” displays in place of
scheduled events.

2. In the Event Schedule window, click the Add Event button to open the Add

Event to Schedule dialog box:

Add an Event

3. Enter a Name for the event.

Advertising