Appendix c mechanical installation, Wall plate installation – Acroprint HandPunch 1000 User Manual

Page 45

Advertising
background image

HandPunch 1000 Manual

43

Appendix C

Mechanical Installation

Select an installation location based on the guidelines provided in the Planning an
Installation section beginning on page 8.

Wall Plate Installation

Wall Preparation

For the following procedure protect the HandPunch from the dust and debris generated
during the wall plate installation process.

1. Remove the wall plate from the packing carton. Refer to Figure 12-1 for all wall plate

references in the following section.

2 UPPER SCREWS

3 LOWER SCREWS

LEVELING HOLE

SURFACE

CONDUIT

ENTRY

Figure 12-1: Wall Plate

2. Measure and mark a point 48 1/2 inches (123 cm) from the surface of the finished

floor. This point will correspond to the Leveling Hole where the top-center point of the
HandPunch should be mounted.

3. For a hollow wall, drive a small nail into the wall at the mark and hang the wall plate

from the Leveling Hole located near the top of the wall plate.

4. For a solid wall, hold the wall plate against the wall, centering the Leveling Hole over

the mark in the wall.Mechanical Installation

Advertising