Demonstration, Operation manual, Running the program – ACU-RITE MILLPWR 3 Axes User Manual

Page 95

Advertising
background image

DEMONSTRATION

MILLPWR

®

Operation Manual

4-19

Running the Program

The first step in running a new program is to establish datum.
Remember to chose the center of the bolt circle as datum.

•

Using the

MOVE TABLE

softkey and the arrows, position the

tool over the workpiece where you want the center of the bolt
circle’s datum to be.

•

Place your workpiece into a vise.

•

From the DRO screen, press the

DATUM

softkey.

•

Press the

X = 0

,

Y = 0

and

Z =0

softkeys to establish

the current tool position as datum.

•

Press the

ARROW DOWN

softkey.

•

Return to your program by pressing the

PGM

key. Perform a

second dry run, this time allowing the table to move, to see if there is
enough material to run the program. Set zero.

•

Touch the tool to the top surface of your workpiece.

•

Set the Z retract position 1” above the workpiece.

•

Press the

USE

key.

If your cursor
is positioned
past the last
step,
MILLPWR
will automati-
cally go to step
001 when you
press GO.

•

Now press the

GO

key and check that the Z-axis

is engaged.

•

Press the

GO

key again.

MILLPWR

will run each

step at dry run speed without stopping.

If the part falls entirely within the workpiece, you can
cut the part.

•

Place the tool you want to use first into the spindle.

•

After you’ve finished moving the table, press the

MOVE

TABLE

softkey again to de-select it.

Advertising