Dell UPS 4200R User Manual

Page 22

Advertising
background image

20

|

Installation and Startup

Installing the Input and Ground Wires

3

Punch a hole in the terminal block cover for the input conduit using a Greenlee

®

punch or similar

device. The hole accommodates 3/4” or 1” IMC conduit.

4

Pull the input wire through the conduit, leaving approximately 2 ft (0.5m) of exposed wire. Attach

a flexible metal fitting to the end of the conduit.

5

Insert the conduit through the wiring access entry and attach the conduit fitting to the panel.

Strip 0.5” (1.5 cm) of insulation from the end of each incoming wire.

6

Connect the input and ground wires to the terminal block according to Table 1.

Table 1. UPS Wiring Specifications

Wire

Function

Terminal

Position

UPS Wire Function

Terminal Wire

Size Rating*

Tightening

Torque

Input

1

Input Ground

5.26–16 mm

2

(10–6 AWG)

2.26 Nm (20 lb in)

2

L2/Neutral In

3

L1 In

* Use 5.26 mm

2

(10 AWG) 75_C copper wire minimum.

7

Replace the terminal block cover.

Advertising